Case Studies

Category Archives: Case Studies

Upgrading Turbine Supervisory & Vibration Monitoring at Uskmouth Power Station

CASE STUDY – APPLICATION ARTICLE 7th October 2009 For Immediate Release POWER STATION UPGRADE BENEFITS FROM SENSONICS SYSTEMS Condition monitoring specialists SENSONICS have made an important contribution to the upgrade of turbine supervisory and vibration monitoring installations at the Uskmouth Power Station in Newport, South Wales. This coal fired power station, originally owned by Welsh

Read More

Power Station Upgrade, On-Time, On-Budget and Up to Speed

CASE STUDY – TECHNICAL APPLICATION ARTICLE 15th January 2009 For Immediate Release POWER STATION UPGRADE, ON-TIME, ON-BUDGET AND UP TO SPEED Appreciating the features of utilising a high integrity Triplex Modular Redundant (TMR) equipment configuration, along with improved reliability and eliminating operational problems, were among the important benefits achieved following the installation of a new

Read More

Latest Monitoring Systems Protect Power Generation

CASE STUDY – APPLICATION ARTICLE 16th July 2008 For Immediate Release LATEST MONITORING SYSTEMS PROTECT POWER GENERATION Updating to the latest monitoring systems which provide more reliable, more accurate data and eliminating time consuming physical overspeed tests associated with mechanical systems, were the important benefits achieved at Fawley Power Station, following the installation of SENSONICS

Read More